HYD151 Homepage

Instructor

TA info

Grading info

Syllabus

Field Assignments

Online TA Help


Last updated: 03/03/08
test

HYD151
Field Methods in Hydrology

WEEK 7

No Class on Monday


Lecture 17: Wells, piezometers, and pumping tests

    Outline:
      Well design/construction
      Slug tests
      Aquifer pumping tests
        Slug tests

    Textbook reading:
      Chapter 12: pages 223-237

    Other reading:
      none.

    Related web links:


Groundwater measurement demonstration

    HOMEWORK #4 IS DUE TODAY AT THE BEGINNING OF CLASS

    Outline:
      Water level recorders
      Well construction video

    Textbook reading:
      none.

    Other reading:
      none.

    Related web links:
      none.


Assignment 5: Groundwater & Sediment Measurement

    We are working around campus to gain exposure to a variety of measurement and monitoring methods associated with subsurface sediment, groundwater, and land-atmosphere interactions.

    Outline:
      Hands-on activities
        Total-station surveying
        Well water level measurments
        Well water quality sampling
        Sediment coring with: hand auger, slide hammer corer, Geoprobe
      UC Davis weather station systems
        radiometers
        evaporation pan
        wind speed anemometers
        wind direction
        sunshine hours measurement
        CIMIS weather station
        Dry versus wet atmospheric deposition
        Bowen ratio method for determining ET
        Lysimeters

    Homework: Due 03/08/08 (2 weeks)
      hyd151asgn5.pdf
      You do not need to use the full report format on this homework. Use a simplified report format but continue to show all calculations, graphs, maps, etc as clearly as possible.




Last Week or Next Week

Options: HYD151 Homepage, Instructor, TA info, Grading info, Syllabus, Field Assignments, Online TA Help.