HYD151 Homepage
Instructor
TA info
Grading info
Syllabus
Field Assignments
Online TA Help
Last updated: 03/03/08
|
test |
HYD151 Field Methods in Hydrology
WEEK 7
No Class on Monday
Lecture 17: Wells, piezometers, and pumping tests
Outline:
Well design/construction
Slug tests
Aquifer pumping tests
Textbook reading:
Chapter 12: pages 223-237
Other reading:
Related web links:
Groundwater measurement demonstration
HOMEWORK #4 IS DUE TODAY AT THE BEGINNING OF CLASS
Outline:
Water level recorders
Well construction video
Textbook reading:
Other reading:
Related web links:
Assignment 5: Groundwater & Sediment Measurement
We are working around campus to gain exposure to a variety of measurement and monitoring methods associated with subsurface sediment, groundwater, and land-atmosphere interactions.
Outline:
Hands-on activities
Total-station surveying
Well water level measurments
Well water quality sampling
Sediment coring with: hand auger, slide hammer corer, Geoprobe
UC Davis weather station systems
radiometers
evaporation pan
wind speed anemometers
wind direction
sunshine hours measurement
CIMIS weather station
Dry versus wet atmospheric deposition
Bowen ratio method for determining ET
Lysimeters
Homework: Due 03/08/08 (2 weeks)
hyd151asgn5.pdf
You do not need to use the full report format on this homework. Use a simplified report format but continue to show all calculations, graphs, maps, etc as clearly as possible.
Last Week or Next Week
Options: HYD151 Homepage,
Instructor,
TA info,
Grading info,
Syllabus,
Field Assignments,
Online TA Help.
|